WARM NOVEMBER AND MORE STEEL INSTALLATIONS

The month of November was a very thankful one not only because of Thanksgiving, but the warmer November really helped the construction progress move forward. The steel is now up to the 11th floor and we continue to pour concrete and install precast planks. As we are always conscious of the safety of local pedestrians; we continue to make the effort in installing tarps to keep construction debris/dust going out to the streets.

IMG_3336

IMG_3346