STEEL ERECTION WELL UNDERWAY

The construction is now above ground and steel erection work is well underway. We are currently framing out the podium level of our Phase 1 building and began concrete slab pours on the decks starting from the western end. To ensure the safety of the pedestrians we have installed a brand new sidewalk shed on the Union Street stretch of the construction site.

IMG_2837

IMG_2831